CALCULATION OF CUT AND FILL VOLUMES USING MINING SOFTWARE AT PT BARAMULTI SUKSESSARANA
DOI:
https://doi.org/10.62567/micjo.v3i3.2673Keywords:
Cut and Fill, Surpac, Volume, Open-Pit Mining, TopographyAbstract
Cut and fill calculation is an essential stage in open-pit mining activities to determine the volume of soil or rock that must be excavated (cut) and deposited (fill) based on elevation changes between the actual topographic conditions and the planned mine design. This study aims to analyze the results of cut and fill volume calculations using GEOVIA Surpac software in a coal pit area. The data used include topographic maps obtained from RTK (Real Time Kinematic) surveys. The calculation results show a total cut volume of 805.42 MT and a fill volume of 2.09 MT, with a net volume of 803.33 MT, using a rock density of 1. The use of Surpac has proven effective and accurate in calculating material volumes and supporting the optimization of mine design.
Downloads
References
Ariyaini, I., & Cahyadi, R. (2025). Perhitungan Volume Overburden Weekly Pada Pit 72 Menggunakan Sofware Surpac 6. 3 di PT Unirich Mega Persada Kecamatan Teweh Baru Kabupaten Barito Utara Provinsi Kalimantan Tengah Pendahuluan Penambangan batubara di Indonesia pada umumnya menggunakan sist. 6(11), 4205–4209.
Elwisa, M., Fikri, H. N., & Hakim, R. N. N. (2022). Analisis Triangulated Irregular Network (TIN) dalam menghitung volume overburden pada survey kemajuan tambang. Jurnal Himasapta, 7(3), 153. https://doi.org/10.20527/jhs.v7i3.7503
Gideon S. S, Henny M., Windhu N., Winarno A., & Tommy T. (2025). Perbandingan Perhitungan Volume Stockpile Batu Andesit Menggunakan Alat Survey Terrestrial Laser Scanner dan Global Positioning Sistem Real Time Kinematik pada PT. Bara Tabang. Venus: Jurnal Publikasi Rumpun Ilmu Teknik, 3(3), 137–153. https://doi.org/10.61132/venus.v3i3.932
Maiyudi, R., Ananda, F., Anaperta, Y. M., & Melbaral, A. (2023). Comparison of Cut and Fill Volume Using Photogrammetric Measurement and Total Station Measurement. Geoscience and Remote Sensing Technology, 1(2), 1–3. https://geo-rest.org/index.php/geo/article/view/7
Maulana, B. F., & Kholiq, M. A. (2025). Overburden Volume Calculation Using Cut and Fill Method At Rhml Jobsite (Riung Harapan Mitra Lestari) PT. Riung Mitra Lestari, Tapin Regency, South Kalimantan Province. Journal of Marine-Earth Science and Technology, 5(3), 69–73. https://doi.org/10.12962/j27745449.v5i3.2723
Ramadhan, H. S., Kurniawan, A., & Darminto, M. R. (2022). Analisis Perhitungan Volume Galian Tambang Terbuka (Open Pit Mining) Menggunakan Interpolasi Metode Gridding. Geoid, 17(1), 99. https://doi.org/10.12962/j24423998.v17i1.10369
Sens, T. R., Hu, C., Benson, C., Park, H., Camps, A., Qiao, L., & Rizos, C. (2021). Addendum : Hu, C.; et al. Detecting Targets above the Earth’s Surface Using GNSS-R Delay Doppler Maps : Results from. 13040715. https://doi.org/10.3390/rs11192327
Sujiman (2018). Teknis Pengukuran Dan Perhitungan Volume Overburden Kemajuan Tambang PT. Putra Perkasa Abadi Menggunakan Surpac 6.3.2. Kecamatan Loa Kulu Kabupaten Kutai Kartanegara Provinsi Kalimantan. Kajian Teknis Tahapan Penambangan Batubara Pada PT. Mega Global Energy Kabupaten Kutai Kartanegara Kalimantan Timur, 1(2), 43–57.
Syetiawan, A., Prayogo, O., & Efendi, J. (2016). Uji Akurasi Penentuan Posisi Metode GPS-RTK. Seminar Nasional Geomatika, 109–116.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Yustina Hong Lawing, Wahyu Riadi, Lutpiandi Lutpiandi, Mardi Sutomo

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.



























