THE IMPLEMENTATION OF PROJECT MANAGEMENT SCHEDULING USING CRITICAL PATH METHOD (CPM) AND PROJECT EVALUATION AND REVIEW TECHNIQUE (PERT) IN THE HOUSE CONSTRUCTION PROJECT IN THE MALIMIMPLEMENTATION OF PROBUKAN PERMAI III HOUSING AREAS IN NORTH MINAHASA REGENCY

Authors

  • Nuraini Retnaningrum Sukamta Sam Ratulangit University
  • Jacky S B Sumarauw Sam Ratulangit University
  • Merlyn Mourah Karuntu Sam Ratulangit University
  • Magdalena Wullur Sam Ratulangit University
  • Ferdinand J Temewu Sam Ratulangit University
  • Shinta Jeanete Camelia Wangke Sam Ratulangit University

DOI:

https://doi.org/10.62567/micjo.v3i1.1830

Keywords:

Project Management, CPM, PERT

Abstract

Previous studies have shown that the Critical Path Method (CPM) and the Project Evaluation and Review Technique (PERT) are effective in optimizing project completion time. Based on observations, the construction of a single housing unit typically requires 64 working days. This study aims to obtain an optimal scheduling result by applying CPM and PERT to the construction project of a subsidized house type-36 in Perumahan Malimbukan Permai III, North Minahasa Regency. The analysis results indicate that the project’s critical path consists of A – B – C – D – E – F – H – K – L – M – N – P – Q. Using the CPM method, the required completion time is 55 days, while the PERT method yields an estimated 55.68 days. With a deadline of 60 days, the probability of completing the project is 99.94%. This study highlights the importance of monitoring the critical path and utilizing time estimation in project planning to prevent delays and unforeseen obstacles.

Downloads

Download data is not yet available.

References

Achmad, FA, Prima, Y., & Rumbyarso, A. (2024). MULTISCIENCE ANALYSIS OF AYANI EYE & ENT SPECIALIST CLINIC PROJECT SCHEDULING USING PERT & CPM. INTERNATIONAL JOURNAL OF MULTISCIENCE , 4 No. 1 , 1–8. https://multisciencejournal.com/index.php/ijm/article/view/367

Adrianti, S., Hafiz, H., Safitri, W., & Huda, M. (2024). Scheduling Analysis of the Multipurpose Saung Construction Project in Cikarang Using PERT and CPM. Journal of Incentive Economics | , 18 (1). https://doi.org/10.36787/jei.v18i1.1267

Alfaris Lulut, Gustian Dudih, Setyorini Retno, & Romli Ikhsan. (2022). Operations Research (Gustian Dudih, Ed.). INDIE PRESS.

Aulia, S., & Cipta, H. (2023). Network Planning Analysis Using CPM and PERT Methods on Optimization of Time and Cost. Synchronous , 8 (1), 171–177. https://doi.org/10.33395/sinkron.v8i1.11961

Auodia Monika Uktolseja Magdalena Wullur Merlyn Mourah Karuntu. (2023). Evaluation of Project Implementation Using PERT and CPM Methods (Case Study: Tolango-Paguyaman, Tolango-Bulontio Road Preservation). Journal of LPPM in the Field of Eco-Social and Cultural Affairs , 6 (2), 1079–1090. https://ejournal.unsrat.ac.id/v3/index.php/lppmekososbudkum/article

Belferik Ronald, Ar. Andiyan, Zulkarnain Isnaini, Prof. Dr. Musran Munizu, Samosir MJ, Afriyandi Hery, Adhicandra, Dr. Ichsan Mohammad, Ir. Syamil, & Ir. Adi Prasetyo. (2023). PROJECT MANAGEMENT THEORY AND ITS IMPLEMENTATION . www.sonpedia.com

Bodunwa, Kikelomo, O., & Olalekan, J. (2020). Application of Critical Path Method (CPM) and Project Evaluation Review Techniques (PERT) in Project Planning and Scheduling. Journal of Mathematics and Statistical Science , 6 , 1–8. http://www.ss-pub.org/wp-content/uploads/2020/01/JMSS19090201.pdf

Budi Santosa. (2023). Project Management Concept & Implementation . Graha Ilmu. https://bintangpusnas.perpusnas.go.id

Daud, M., Suliawati, & Arfah, M. (2024). Application of Project Management with CPM and PERT Methods in the Construction of the Operational Building of Dr. H. Kumpulan Pane Regional Hospital, Tebing Tinggi City. ARTI Journal: Industrial Engineering Design Applications , 19 No. 2 , 88–97. https://doi.org/https://doi.org/10.52072/arti.v19i2.832

Fadila, N., Suliawati, & Arfah, M. (2024). Project Management Analysis Using the CPM (Critical Path Method) in the Construction of Subsidized Housing in the Sultan Area City Housing Complex, Pinang City. Factory Journal of Industry, Management and Industrial Systems Engineering , 3 (1), 9–19. https://doi.org/10.56211/factory.v3i1.616

Fatmawaty Rachim. (2022). Project Management Planning - Scheduling - Project Control (Ir. Ritnawati, Ed.). FACULTY OF ENGINEERING, FAJAR UNIVERSITY.

Hadicara, D., Rochim, A., & Pratikso. (2023). The Use of PERT and CPM Methods in Road Construction Projects. FOUNDATION , 28 No. 1 , 32–44. https://doi.org/http://dx.doi.org/10.30659/pondasi.v28i1.30148

Hendriyani, I., Kencanawati, M., & Vizay Darmawan, M. (2023). APPLICATION OF CPM AND PERT METHODS IN PIPE INSTALLATION PROJECT SCHEDULING IN GRAHA WIYATA ASRI HOUSING HOUSING IN BALIKPAPAN . 5 No. 3. https://transukma.uniba-bpn.ac.id/index.php/transukma/article/view/160

Kerzner Harold. (2022). PROJECT MANAGEMENT A Systems Approach to Planning, Scheduling, and Controlling . John Wiley & Sons, Inc. www.wiley.com.

Mahyuddin, Ritnawati, Rachim Fatmawaty, Mursalim Erdawati, Pandarangga Adi Papa, Ulfiyati Yuni, Sidiq Rustam, & Rosytha Anna. (2023). Construction Project Management (Abdul Karim, Ed.). our foundation writes.

Mariana, Y., & Wijaksono, S. (2021). Project Evaluation and Review Technique (PERT) Analysis in the renovation project of the Church of St. John the Evangelist, Jakarta. IOP Conference Series: Earth and Environmental Science , 794 (1). https://doi.org/10.1088/1755-1315/794/1/012188

Marpaung, R., Daulay, IN, & Tambunan, V. (2022). Optimizing the scheduling of a palm oil mill construction project using the PERT and CPM methods at PT. Bintang Riski Abadi. SOROT , 17 (2), 117–127. https://doi.org/10.31258/sorot.17.2.117-127

Moningka Agnes K, Dundu Ariestides, & Tjakra Jermias. (2024). Application of the Critical Path Method in Time Management in the Lahendong Road Reconstruction Project (1). TEKNO , 22 No.90 , 2258–2266. https://ejournal.unsrat.ac.id/v3/index.php/tekno/article/view/60580/48690

Nabilah Nada, Juhara Sutresna, & Nathasia Adinda. (2024). SCHEDULING ANALYSIS OF APARTMENT DEVELOPMENT PROJECTS USING THE CPM (CRITICAL PATH METHOD). CIVIL ENGINEERING STRUCTURE , 6 (2), 66–74. https://jurnal.umt.ac.id/index.php/structure/article/viewFile/12566/5766

Noer Karina Tika Saputri. (2022). IMPLEMENTATION OF PROJECT MANAGEMENT WITH CPM (CRITICAL PATH METHOD) AND PERT (PROJECT EVALUATION AND REVIEW TECHNIQUE) METHOD IN ANDARA HOUSING DEVELOPMENT PROJECT IN TARAKAN CITY [Borneo Tarakan University]. https://repository.ubt.ac.id/repository/UBT28-06-2022-114022.pdf

Perdana, MA, & Sari, RP (2022). Optimizing the Implementation Time of a Residential Construction Project Using the CPM (Critical Path Method) and PERT (Program Evaluation and Review Technique) Methods. Journal of Engineering Media and Industrial Systems , 6 (2), 116. https://doi.org/10.35194/jmtsi.v6i2.1944

Project Management Institute. (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Seventh Edition (ENGLISH) (7 ed.).

Ralahallo Natalia Fransiska, Jaya Hendi Fery, & Tukimun. (2024). Project Management (Maryanto Joko, Ed.). SULUR PUSTAKA. www.sulur.co.id

Riga Ari Nurgani, Tasya Aspiranti, & Asni Mustika Rani. (2024). Analysis of House Building Project Management Control Using the Critical Path Method (CPM). Bandung Conference Series: Business and Management , 4 (1), 693–702. https://doi.org/10.29313/bcsbm.v4i1.11764

Sandra Melly, Iranita Haryono, Ely Mulyanti, Dyah Setyawati, Andi Yunus, Hidayanto, Norbertus Saptad, Iskanda Rela, & Tiawan. (2024). PROJECT MANAGEMENT (Atmaja Eddy Jajang Jaya, Ed.). HEI PUBLISHING. https://www.researchgate.net/publication/385652653

Sinurat, F., & Misdalena, F. (2024). Project Management Analysis Using the Critical Path Method (CPM) on the Chandra Tanjung Karang Building Construction Project. Construction Journal , 22 (2), 98–107. https://doi.org/10.33364/konstruksi/v.22-2.2131

Soeparyanto, TS, Nuhun, R., Annisa, A., Yusran, Y., Ariatno, H., & Zulfitrah, LOM (2024). Analysis of Project Scheduling Using the CPM Method (Case Study of Prayer Room Construction in PT. Journal of Civil Engineering and Planning , 5 (1), 16–24. https://doi.org/10.37253/jcep.v5i1.9206

Sugiyono. (2023). QUANTITATIVE, QUALITATIVE, AND R&D RESEARCH METHODS . www.cvalfabeta.com

Syifa Nur Afiya, Ardana Sultan Alhaq, & Kusnadi. (2023). Analysis of the application of time management using the CPM method in the Griya Mahari housing development project. JENIUS: Journal of Applied Industrial Engineering , 4 (2), 271–283. https://doi.org/10.37373/jenius.v4i2.636

Thoengsal, J., & Tumpu, M. (2022). Optimization Method for Scheduling Construction Projects Using the Critical Path Method (CPM) . TOHAR MEDIA. https://www.researchgate.net/publication/362325239

Wilar Wingky, Malingkas, GY, & Mangare, JB (2025). Application of Time Management Using the CPM (Critical Path Method) in the Development of the SMKS Kema Perintis Laboratory Project. TEKNO , 23 (91), 107–116. https://ejournal.unsrat.ac.id/v3/index.php/tekno/article/view/60792/48826

Wulan Ratna Elis. (2019). Project Management with PERT or CPM (S. Wahyu Eko, Ed.). PT. Lontar Digital Asia www.bitread.id

Published

2026-01-15

How to Cite

Sukamta, N. R., Jacky S B Sumarauw, Merlyn Mourah Karuntu, Magdalena Wullur, Ferdinand J Temewu, & Shinta Jeanete Camelia Wangke. (2026). THE IMPLEMENTATION OF PROJECT MANAGEMENT SCHEDULING USING CRITICAL PATH METHOD (CPM) AND PROJECT EVALUATION AND REVIEW TECHNIQUE (PERT) IN THE HOUSE CONSTRUCTION PROJECT IN THE MALIMIMPLEMENTATION OF PROBUKAN PERMAI III HOUSING AREAS IN NORTH MINAHASA REGENCY. Multidisciplinary Indonesian Center Journal (MICJO), 3(1), 908–922. https://doi.org/10.62567/micjo.v3i1.1830

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)